Safety measures before engineering drilling rig operation

Jan 26, 2023

In order to ensure the smooth operation of the engineering drilling rig, what are the safety measures before the engineering drilling rig operation?

Before the operation of the engineering drilling rig, it is necessary to check whether the installation of the unit is correct and stable, and whether the connecting bolts of each part of the machine body are in a fastened state. If the connecting bolts are loose, they need to be tightened and repaired in time. Adjustment.

The construction environment of some engineering drilling rigs is soft foundation pile machine construction, which is prone to safety accidents, so it is necessary to use cables to reinforce the pile driver, and set two reinforcement cables at a certain safety angle away from the existing line to ensure the safety of the engineering drilling rig The production is stable, which can not only avoid the impact on production, but also prevent the production safety hazards of engineering drilling rigs.

Before starting up the engineering drilling rig or after working continuously for a certain period of time, check the oil temperature of the mailbox. If the oil temperature is below 10°C, it must be operated with no load to increase the oil temperature. If the oil temperature is high and exceeds 55°C Use the cooling method to reduce the oil temperature (the pressure value of the cooling water should not exceed 1MPa).